FAA AC 150/5370-10 Grade Requirements for Airport Construction
What AC 150/5370-10 requires for grade documentation — runway tolerance ±0.04 ft, 50-foot station intervals, and lift-by-lift documentation requirements.
Grade documentation and QC requirements for FAA-funded airport construction projects.
5 articles
What AC 150/5370-10 requires for grade documentation — runway tolerance ±0.04 ft, 50-foot station intervals, and lift-by-lift documentation requirements.
AIP project QC documentation — QC plan components, daily reports, compaction test logs, material certifications, and record retention requirements.
Step-by-step airport grade verification — setting control from monuments, shooting 50-foot station grades, comparing to design, and getting inspector sign-off.
What a failed FAA grade inspection costs — $5,000-15,000 re-inspection mobilization, 2-4 week delays, and AIP funding review risk.
Comparing paper binders, Excel, general PM software, and purpose-built field verification tools for FAA-compliant airport construction QC documentation.
Log every field check, generate inspector-ready as-built PDFs, and share results instantly. Free for 14 days.