Updated May 2026
Saudi Arabia's Vision 2030 program includes Giga Projects (NEOM, Red Sea Project, Qiddiya, Diriyah Gate) representing hundreds of billions in construction value. NEOM alone involves unprecedented construction documentation requirements for linear city THE LINE, mountain resort Trojena, and industrial city OXAGON. International EPC contractors on these projects use US and international documentation standards. Grade verification for solar farms, roads, and foundations follows the same principles Sitemark is built on.
Dubai and Abu Dhabi have among the world's most active construction environments. Expo 2020 legacy development, Dubai Urban Plan 2040, and Abu Dhabi's Vision 2030 drive continuous major construction. Sabkha soil (salt-laden coastal flats) in UAE coastal areas requires special documentation — compaction in sabkha is technically complex and documentation of moisture conditioning and compaction results is critical for foundations.
Temperatures above 40°C during Gulf summers require special documentation: concrete temperature at delivery and placement (ACI 305 limit: max 35°C at delivery), cooling methods used (chilled water, ice, pre-cooling aggregates), placement time window, and curing temperature monitoring. Sitemark's daily field report captures all these fields in a single document.
Precision Equipment for Contractors
Topcon, Trimble, Leica, and Spectra Precision equipment — authorized dealer, always 3% under competitors.
Shop Equipment at Express Tools →ASTM and USACE standards. Works on NEOM, Vision 2030, and infrastructure projects across the GCC.
Start Free Trial