Rough grade is the approximate graded elevation established by earthmoving equipment after bulk cut and fill operations are complete, typically at a specified tolerance above the finish subgrade to allow for base course material. Rough grade provides the platform on which base course, pipe, and other improvements are built before the final grade layer is placed.
Log grade shots, verify elevations, and generate inspector-ready field reports from your phone. No office work required.
Get started free →