A regional EPC contractor cut pile elevation verification from 3 days to 4 hours on a 200-acre solar farm — and stopped submitting spreadsheets as as-built documentation.
2,400
Piles verified
4 hrs vs 3 days
Time to verify
±25 mm
IFC tolerance
After two rejected submittals on a 3-mile municipal gravity sewer project, a utility contractor switched to digital invert logging. The city inspector accepted the next submittal on the first pass — on site.
3 miles
Sewer length
2
Prior rejections
First-pass acceptance
Result
Surveyor callbacks for pad elevation re-checks were costing $800–$1,200 per visit. After rolling out Sitemark on an 85-lot subdivision, the team dropped from 6 re-check calls per project to 1.
85
Lots
$800–$1,200
Cost per callback
6 to 1
Callbacks reduced