Every compaction test, grade check, and superelevation reading becomes a formatted DOT QC report in seconds — not hours.
The primary QC document for earthwork and paving lifts. Shows every compaction test for each lift, organized by station, with dry density, compaction percentage, Proctor reference, and pass/fail. DOT resident engineers use this document to authorize lift acceptance before the next lift begins.
Report Contents
Sample Report Preview
Station-by-station superelevation verification for horizontal curves. Documents actual cross-slope vs design superelevation at each curve station, including runoff and runout transitions. Required for DOT acceptance on any project with design speeds above 45 mph.
The daily QC report combining compaction, grade, and superelevation records into a single signed document. State DOT resident engineers use this as the primary acceptance record for each construction day. Accepted by CDOT, TxDOT, and ADOT.
State DOT Acceptance
No add-ons, no per-report fees. Just DOT-accepted documentation from the field.