Every report is generated directly from field-collected data. No manual compilation. No transcription errors. No late-night spreadsheet sessions before the morning deadline.
The primary QA document for pile installation. This report contains a complete pile-by-pile elevation table showing design elevation, actual (as-driven) elevation, variance from design, EPC tolerance band, and pass/fail status for every pile in the block.
EPCs use this document to verify that every pile in a block meets their conformance specification before authorizing racking installation. Sitemark generates it in under 5 seconds from field-logged data — no compilation required.
Report Contents
Sample Report Preview
The management-level view. EPCs use this document to track conformance status across multiple blocks and authorize racking mobilization on a block-by-block basis. It shows aggregate pass rates, open corrective actions, and the sign-off fields required by EPC QA protocols.
Most EPCs require this document as the cover sheet for the full As-Driven submittal package. It gives their QA manager a one-page view of whether the block is ready to rack before they dive into the pile-level detail.
Report Contents
Sample Report Preview
A combined, submittal-ready PDF that bundles everything an EPC needs to authorize racking installation: the Block Conformance Summary, the full As-Driven pile elevation table, the GPS location map, calibration records for all instruments used, and the corrective action closeout log. One file, one email, one sign-off.
Tab 1: Block Conformance Summary
One-page aggregate for the EPC QA manager with sign-off block.
Tab 2: As-Driven Pile Elevation Table
Complete pile-level data for every pile in the block with pass/fail.
Tab 3: GPS Pile Location Map
Site map with color-coded pile markers overlaid on block layout.
Tab 4: Calibration Records
Instrument serial numbers, calibration dates, and calibration authority.
Tab 5: Corrective Action Log
All corrective actions: original failure, re-drive result, closure date.
Tab 6: Project Quality Statement
Contractor QC manager certification that all pile checks meet EPC spec.
All three reports are included with every Sitemark plan. No add-ons, no extra charge.